General information
Tanks features
Berth for vessels
Installation of loading tanker trucks
Installation of loading rail trucks
Addition system
Vapour recovery unit
System of separation of hydrocarbons
Pumps areas
Fire prevention and safety system
Security system
Berths for vessels

BERTH AT THE DOCK OF INFLAMMABLE
  • Maximum DRAFT : 11 meters.
  • Maximum LOA: 190/200 meters.
  • 2 marine loading arms of 10" that can download over 5 lines (3 of 16” and 2 of 10”).
  • Multiproduct lines “pig” system.
  • Fire prevention and safety system by curtains of water and automatic tower monitor.
  • Spill containment boom at sea during anti-pollution operations.
  • Service of "ship to ship" with a berth at the Chemical Wharf.

BERTH AT THE CHEMICAL WHARF

  • 500 meters of berth line, 15,1 metres DRAFT, 260 meters LOA, vessels> de 100.000 DWT.
  • 2 marine loading arms of 16".
  • Possibilities to operate with major traffic, operating flexibility.
  • Service of "ship to ship" with a berth at the Dock of Inflammable.

 image003.jpg

 
Web desarrollada por: Girotecnics T.I., S.L.