EUROENERGO ended 2020 with a 100% of occupation in its terminal located in Tarragona’s port. With a capacity of 331.000 m3 distributed among 18 diposits, EUROENERGO’s storage park registered full occupation with petroleum products and bi-fuel. This number contrasts with the 90% that they obtained in 2019.

EUROENERGO is the company in his sector taking the most part in the concession for the enlargement of the chemical in Tarragona’s port. In specific, 8,1 hectares out of the 18 of the entire port ampliation. The company is waiting for the environmental permits to initiate the ampliation constructions in various phases.

EUROENERGO counts with three moorings: two of them with a length of 250 m and fretwork of 15,1 m for ships of large tonnage up to 140,000 tons, and the third berth has a length of 200m and a draft of 11m for ships up to 45,000 tons. The three berths are connected by pipeline with each other and also with the Storage Terminal, which allows greater versatility and greater capacity for simultaneous operations, including the “berth to berth” service.

The EUROENERGO‘s terminal provides the latest technologies available in the sector with the aim of being at the service of its clients guaranteeing a personalized and independent service. With a commitment to continuously improving the quality, safety and respect for the environment in its activities.